SALE!! APARTMENTS WITH PRIVATE ROAD TO THE BEACH, NEW CONSTRUCTION, FIRST ROW TO THE SEA - VIR, SOUTHERN SIDE
For sale APARTMENTS in two residential buildings in new construction, 30 m from the sea on the southern side of the island of Vir. The property consists of ground floor and first floor.
PROPERTY DESCRIPTION:
BUILDING A
GROUND FLOOR - S1 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, terrace, loggia, 2 parking spaces) - total area - 137.61 m2 - usable area 56.61 m2 - 215,000.00 EUR - SOLD!
S2 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, terrace, loggia, 2 parking spaces) - total area - 97.12 m2 - usable area 54.67 m2 - - 195,000.00 EUR - SOLD!
1ST FLOOR - S3 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, roof terrace, loggia, 2 parking spaces) - SOLD!
S4 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, roof terrace, loggia, 2 parking spaces) - total area - 131.59 m2 - usable area 66.07 m2 - 235,000.00 EUR - SOLD!
BUILDING B
GROUND FLOOR - S5 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, terrace, loggia, 2 parking spaces) - total area - 102.59 m2 - usable area 58.28 m2 - 205,000.00 EUR - SOLD!
S6 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, terrace, loggia, 2 parking spaces) - total area - 116.57 m2 - usable area 57.31 m2 - 280,000.00 EUR
1ST FLOOR - S7 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, roof terrace, loggia, 2 parking spaces) - total area - 142.13 m2 - usable area 70.70 m2 - 250,000.00 EUR - SOLD!
S8 (2 bedrooms, living room + kitchen, bathroom, hallway, garden, roof terrace, loggia, 2 parking spaces) - total area - 145.24 m2 - usable area 68.75 m2 - 335,000.00 EUR - SOLD!
- private road to the beach;
- arranged pebble beach;
- 2 parking spaces per apartment
MATERIAL DESCRIPTION:
- glass fences made of dark glass;
- roof terrace with ceramics;
- floor heating in bathrooms with digital thermostat;
- air conditioning in every room and living room (Wi-Fi control);
- mosquito nets and electric blinds on all openings;
- high quality sanitary equipment;
- high quality ceramic tiles rectified (laser cut edges);
- PVC carpentry on the outside in anthracite color and on the inside in white
Construction will begin in the spring of 2023 and the planned completion is in the spring of 2024.
For any additional information and to schedule a tour, feel free to contact us at any time with confidence.